The main part of the Train Room floor is complete! What remains is a 3x11 foot section, which contains two closets. The consistency of that section of the floor is rather odd. The surface ranges from yellowish to greyish to blackish. Scraping it is a challenge, because it is quite difficult to tell when you have reached the bottom layer of material. The main part of the room, while difficult, was very easy to tell when the raw floor was reached through scraping. I will attack this new section the same as the other, but it provides different challenges.

Today is Thanksgiving, and we are hosting the Gamsbys and Seemans. We have decorated for the event, which includes many autumny harvesty things, and a train!


This part of the floor is done!


This part of the floor is weird and in progress


Thanksgiving kitchen decor