Thursday, August 22, 2013

Consolidation and Christmas Decor

Over the past week, I set up my workshop in the garage, thanks in part to a borrowed hammer drill for concrete drilling. This drill was so fun that is spawned other projects as well. I built and installed a railing for our front steps, and moved some theatre items about in the garage to make space for tubs that were sitting in the Train Room. Most of these tubs contain Christmas decor, and I consolidated several small tubs of stuff into a few big tubs of similar stuff. Amber helped with hanging up a railroad-themed welcome sign, pointing to the Train Room door. I also moved furniture around in the Train Room to their actual proposed final positions. They will have to be moved again when the room gets repainted and re-floored, but it gives us a good idea of what space will be available. So I'll leave you with a few updated views of the Train Room and hallway...

Train Room as of 8/22/2013. Believe it or not, things on the right side of the room are much more organized now.

The first artwork to be hung in the basement. Thanks to my wife for hanging it up :)

No comments:

Post a Comment